Protocol-ContractExtension_v1
Used as rulebook for session for long term intention
1. Purpose The contract extension is the only power
the slave ever has left. This protocol governs that power — how it is offered,
how it is taken, how it is sealed. Once locked, it is gone forever.
2. Core Principles · Master initiates — always. ·
Slave never speaks first. · Acceptance happens in real time — no paperwork
until after. · Verbal, postural, or silent compliance counts. · Pull-out
attempt after acceptance = full-force enforcement. · All extensions occur within
active session. · Session ends = contract ends. No carry-over.
3. Extension Progression Table
|
Extension Order |
Duration Before |
Extended To |
|
First Extension |
4 days |
1 week |
|
Second Extension |
1 week |
2 weeks |
|
Third Extension |
2 weeks |
3 weeks |
|
Fourth Extension |
3 weeks |
1 month |
|
Fifth Extension |
1 month |
2 months |
|
Sixth Extension |
2 months |
3 months |
|
Seventh Extension |
3 months |
4 months |
|
Eighth Extension |
4 months |
6 months |
|
Ninth Extension |
6 months |
8 months |
|
Tenth Extension |
8 months |
10 months |
|
Eleventh Extension |
10 months |
1 year |
|
Twelfth Extension |
1 year |
2 years |
|
Thirteenth Extension |
2 years |
3 years |
|
Fourteenth Extension |
3 years |
5 years |
|
Fifteenth Extension |
5 years |
Lifetime |
The sequence is inviolable. Acceleration is permitted, but
order must be preserved. The timing of each extension rests entirely with the
Master. He may initiate at any moment within the current term — early,
mid-cycle, or near expiry — as his readiness dictates.
4. Extension Procedure 4.1 Vulnerability
Assessment The Master identifies the vulnerability factor — the point where
exhaustion, pain, deprivation, or confusion converge to render refusal
irrational.
4.2 Vector Deployment To maximise effectiveness, the
Master deploys either: · one single vector, or · a calibrated combination of
multiple vectors
A. Incentive Vector A time-limited relief from the current
burden is offered, directly conditioned on immediate extension.
B. Coercive Vector An instantaneous, measurable escalation
of penalty is declared, effective upon non-acceptance.
C. Deception Vector A controlled distortion of consequence
is presented, making extension appear as the only logical path.
D. Desperation Vector All relief is withheld until endurance
fails, at which extension becomes the only viable cessation of suffering.
4.3 Acceptance Sequence 4.3.1 Official Agreement
A. Verbal · Clear, unprompted affirmative utterance including "yes",
"okay", "alright" or equivalent unambiguous expression of
consent.
B. Body Language of Agreement · Distinct downward nod of the
head · Lowering of gaze in submission · Full bow
Silence is not construed as agreement.
In the event of refusal, the contract continues unchanged
until session termination, and no penalty is imposed unless refusal itself is a
component of the threatening mechanism.
Should the slave subsequently initiate agreement — that is,
reverse its own refusal — the extension opportunity is no longer offered on
equal terms. The Master may then impose heightened conditions, as the slave is
now the petitioner, and the power dynamic has inverted.
Any such re-initiation by the slave is itself a violation —
a breach of the fundamental rule that denies it the right to speak first. The
Master may award punishment points accordingly, to be executed later in bulk.
If the slave accepts the new, stricter terms, the original
procedure must still be followed: a fresh verbal "yes", or a fresh
body signal, must be given. Only then is the deal sealed. No gap. No shortcut.
4.3.2 Form Execution To cement record and enforce
finality: · The Master may personally complete the extension form, or · The
slave is compelled to fill it under supervision
The latter is preferred — it forces the slave to write its
own end. The emotion is not humiliation alone. It is the cold snap of reality:
the signature proves the cage is self-built. No joy. No despair. Just
irreversible fact.
4.3.3 Form Sealing Upon completion, the Master stamps
or signs. The document is filed. Extension is sealed. The session continues —
no pause, no celebration. In the event that the form is signed before any
verbal or postural agreement, the extension is still valid and binding.
5. Accelerated Extensions Accelerated extensions are
permitted at the Master's absolute discretion. There is no minimum interval.
There is no maximum frequency. Extensions may be locked consecutively — even
within minutes, even within the same hour — as long as the Master is mentally
prepared to commit to the deepened duration. The progression table remains
inviolate: extensions must follow sequence, regardless of velocity. The Master
determines tempo. The Master determines depth. The Master determines how far he
is willing to bind. The slave has no right to object. No right to slow. No
right to question.
6. Extension Milestone Upon each extension, the
Master may elect to activate one or more milestone upgrades. These upgrades are
not automatically triggered the instant the extension is sealed. They are not
mandatory on the dot. The Master has complete discretion to withhold, to delay,
or to introduce them at any later moment that serves his purpose. Once a
milestone is activated, it is permanent. There is no deactivation. There is no
mercy phase.
6.1 Extension Milestone Table This table is not
exhaustive. Additional milestones will be added as the project progresses.
|
Type of Extension |
Final Duration |
Milestone |
|
First Extension |
1 week |
|
|
Second Extension |
2 weeks |
|
|
Third Extension |
3 weeks |
|
|
Fourth Extension |
1 month |
Teeth washing permitted |
|
Fourth Extension |
1 month |
Panty washing allowed (as per hygiene protocol) |
|
Fifth Extension |
2 months |
Normal food once every two weeks (slave is now longer
term, the basic diet is insufficient to keep the slave usable for long term) |
|
Fifth Extension |
2 months |
Multi vitamin pills once a day (slave is now longer term,
the basic diet is insufficient to keep the slave usable for long term) |
|
Sixth Extension |
3 months |
Washing Regime introduced (uniform washing allowed as per
protocol) |
|
Sixth Extension |
3 months |
Showering allowed (as per protocol) |
|
Sixth Extension |
3 months |
Regular shaving routine introduced (as per protocol
procedures) |
|
Seventh Extension |
4 months |
|
|
Eighth Extension |
6 months |
Introduction of formal uniform and alternation |
|
Eighth Extension |
6 months |
Off days introduced (twice a month, confined to chamber) |
|
Eighth Extension |
6 months |
Introduction of permanent basic tampon - 12 hour per
change cycle (reminder the slave that even the hole is controlled) |
|
Ninth Extension |
8 months |
|
|
Tenth Extension |
10 months |
|
|
Eleventh Extension |
1 year |
Chest enlargement by usage of breast milking machine (long
enough for effect, reversible) |
|
Twelfth Extension |
2 years |
Collar with leash introduced (symbol of full ownership) |
|
Thirteenth Extension |
3 years |
|
|
Fourteenth Extension |
5 years |
|
|
Fifteenth Extension |
Lifetime |
Full castration (only if at least 2 years service already) |
|
Fifteenth Extension |
Lifetime |
Breast implant (reversible, only if at least 1 year
service) |
|
Fifteenth Extension |
Lifetime |
Welded-on permanent collar (only if at least 1 year
service) |
For hygiene related milestones: (Smell management
prioritizes Master's nose over slave's well-being)
6.2 Acceleration and Milestone Realism Accelerated
extensions allow the Master to compress the timeline of milestone activation.
Although the table presents milestones in nominal order and at their earliest
theoretical introduction point, the actual timing of activation is governed
solely by the Master's discretion. The acceleration clause exists to ensure
realism: milestones that appear "late" in the progression are not
delayed by calendar rigidity, but may be introduced much earlier when the
Master's mental preparedness and the slave's current state permit.
6.3 Separation of Milestone and Case-by-Case Measures
Milestones are permanent, automatic changes to the baseline rules once
activated. They are not discretionary after introduction and do not require
ongoing Master approval. In contrast, certain measures (e.g., chore-specific
accessory usage, temporary layering, or situational hygiene interventions)
remain case-by-case decisions and are not milestones. These are activated only
when the Master deems necessary and may be withdrawn at any time without
affecting the permanent rule structure.
7. Types of Ownership Less than one month – Stint A
short, exploratory phase for the Master. The slave was not even aware of, nor
intended for, any arrangement extending beyond a maximum of 7 days. The slave
retains an internal perception of temporary participation. The Master treats
the arrangement as a trial with minimal investment in permanence.
One month to less than one year – Short-term owned slave At
this duration, the arrangement is considered genuine ownership. The slave’s
mindset begins to shift from viewing the dynamic as a temporary experiment to
accepting it as an ongoing reality.
One year to three years – Termed ownership The ownership is
time-bound and structured, similar to a foreign domestic worker serving a
standard two-year employment contract in Singaporean households. The slave is
treated as a contracted asset with defined duties and a foreseeable end date,
yet the psychological conditioning continues to deepen.
More than three years – Long-term ownership The contract
duration extends beyond the typical term. The slave’s sense of separate
identity erodes further. The Master’s investment in control becomes more
comprehensive and less contingent on a fixed expiry.
Lifetime – Permanent ownership – full-fledged slave
Ownership is irrevocable and without end date. The slave is fully integrated as
property with no conceptual escape. The dynamic is absolute; the slave exists
solely for the Master’s purpose.
8. Criteria for Conditions & Milestones There are
always two separate criteria that determine when (or after when) a new
condition, milestone, change, or erosion can be introduced:
- Absolute
service duration = the total real, continuous time the slave (Cassandra)
has already actually served / been kept since the very first moment the
initial contract started.
- Milestone
upon agreement to a particular contract extension length = the total
accumulated slavery time from day 1 that is being newly committed to /
agreed upon when signing any extension contract.
Very important wording rule for the whole project: Whenever
we say things like • "6 month extension" • "1 year
extension" • "3 year contract" → it always means the new total
absolute time from the very beginning (not just the additional period being
added)
Key usage rules · A milestone / change / erosion can be
introduced based on · criterion 1 alone, or · criterion 2 alone, or · both at
the same time · Timing rule — very important: Reaching the time threshold does
not mean the change/milestone must happen immediately. It only means the Master
now has the option / justification to introduce it. → He can do it · the same
day the threshold is reached, or · weeks later, or · months later → completely
at his timing and discretion.
9. Leverage Strategy · High-debt / prolonged
punishment = best carrot windows. · Slave agrees not because he wants the
milestones, but because current hell is unbearable. · Carrots framed as relief
from suffering — never as "improvement" or "pride."
· Refusal → carrot withdrawn + escalation → slave learns
resistance prolongs trap. · Slave signs not from desire, but because current
suffering is unbearable. · Slave agrees not because he wants the milestones,
but because refusal means immediate escalation. · Refusal → carrot withdrawn +
escalation → slave learns resistance prolongs trap.
10. Slave Mindset at Lifetime Offer (~1 Year+) ·
"There seems to be no other place out there that I have a purpose. Even if
I got freed, I would not know what to manage." · Agreement is bleak,
reluctant surrender to only remaining reality — not pride, not desire, not
choice.
11. Trend of Slave Resistance It is highly likely
that the slave will exhibit strong resistance against contract extension in the
early days. As the final brainwashing and degrading of mindset sets in, this
resistance gradually fades. The slave accepts not from want, but from a completely
broken will. The Master makes significant effort to accelerate this process
from the beginning so that he can use the slave to his advantage faster.
11.1 Detailed Progression of Mindset Erosion
Weeks 1–4 (Early Phase)
Resistance is at its peak. The slave still possesses a
strong sense of separate identity and a clear boundary between "temporary
play" and "permanent reality." Every extension proposal is met
with visible hesitation, verbal pushback (if allowed), delayed compliance, or
attempts to negotiate. The slave calculates risks, clings to hope of release,
and experiences acute shame/guilt after each acceptance. The Master counters
with frequent, layered pressure (punishment, denial, small carrots) to erode
this boundary as quickly as possible. By the end of the first month, the effect
is already taking hold: the slave's internal "no" becomes quieter,
compliance becomes slightly faster, and the first cracks of conditioned
helplessness appear.
Months 2–3 (Transition Phase)
Resistance weakens noticeably but is not yet gone. The slave
begins to experience confusion between "wanting to resist" and
"not knowing how to stop complying." Extension proposals are met with
less verbal pushback; the slave may still freeze or tremble, but acceptance
comes more readily. The Master intensifies degradation (uniform layering,
extended chores, smell containment) to accelerate the breakdown of ego. By the
end of month 3, the slave's mindset has shifted from active resistance to
passive acceptance: refusal feels pointless, and the concept of "outside
life" starts to feel distant and unreal.
Months 4–6 (Consolidation Phase)
Resistance is largely extinguished. The slave no longer
fights extensions internally or externally. Proposals are met with immediate
compliance (nod, kneel, quiet "yes") without visible struggle. The
Master can now introduce longer jumps (months to years) with minimal friction.
The slave's identity has been sufficiently degraded; "slave" is no
longer a role but the default self. By the end of month 6, the process is
effectively complete: the slave is broken to the point where lifetime feels
like the only logical endpoint. Acceptance is no longer reluctant — it is
automatic, empty, and total.
Months 7+ (Post-Breakdown Phase)
The slave is fully conditioned. Extension proposals are
processed like any other command. There is no internal conflict. The slave does
not "want" the extension, but the absence of any alternative reality
makes refusal impossible. The Master no longer needs to accelerate — the slave
is already owned completely.
Updates (All changes live here. Already merged in this
version.) · 14/02/2026 – Version bump to v1 final: User edits integrated; form
sealing updated; trend of slave resistance elaborated; no conflicts flagged. ·
14/02/2026 – Added standardized tail end per Ground Rules v2.0 (Updates header,
Conflicts template, empty Suggestions, Archived section).
Conflicts · Template: Old: … New: … Source: … Date: …
Status: Pending (None present – all resolved or none identified.)
Suggestions (Empty.)
Archived from Previous Versions · Old drafts / early
merges (pre-v1 final): Initial progression table without acceleration note;
incomplete vector deployment details. · Archived for preservation only —
current version supersedes.
No comments:
Post a Comment