Friday, 9 January 2026

Protocol-Contract Extension

 

 Protocol-ContractExtension_v1
Used as rulebook for session for long term intention

1. Purpose The contract extension is the only power the slave ever has left. This protocol governs that power — how it is offered, how it is taken, how it is sealed. Once locked, it is gone forever.

2. Core Principles · Master initiates — always. · Slave never speaks first. · Acceptance happens in real time — no paperwork until after. · Verbal, postural, or silent compliance counts. · Pull-out attempt after acceptance = full-force enforcement. · All extensions occur within active session. · Session ends = contract ends. No carry-over.

3. Extension Progression Table

Extension Order

Duration Before

Extended To

First Extension

4 days

1 week

Second Extension

1 week

2 weeks

Third Extension

2 weeks

3 weeks

Fourth Extension

3 weeks

1 month

Fifth Extension

1 month

2 months

Sixth Extension

2 months

3 months

Seventh Extension

3 months

4 months

Eighth Extension

4 months

6 months

Ninth Extension

6 months

8 months

Tenth Extension

8 months

10 months

Eleventh Extension

10 months

1 year

Twelfth Extension

1 year

2 years

Thirteenth Extension

2 years

3 years

Fourteenth Extension

3 years

5 years

Fifteenth Extension

5 years

Lifetime

The sequence is inviolable. Acceleration is permitted, but order must be preserved. The timing of each extension rests entirely with the Master. He may initiate at any moment within the current term — early, mid-cycle, or near expiry — as his readiness dictates.

4. Extension Procedure 4.1 Vulnerability Assessment The Master identifies the vulnerability factor — the point where exhaustion, pain, deprivation, or confusion converge to render refusal irrational.

4.2 Vector Deployment To maximise effectiveness, the Master deploys either: · one single vector, or · a calibrated combination of multiple vectors

A. Incentive Vector A time-limited relief from the current burden is offered, directly conditioned on immediate extension.

B. Coercive Vector An instantaneous, measurable escalation of penalty is declared, effective upon non-acceptance.

C. Deception Vector A controlled distortion of consequence is presented, making extension appear as the only logical path.

D. Desperation Vector All relief is withheld until endurance fails, at which extension becomes the only viable cessation of suffering.

4.3 Acceptance Sequence 4.3.1 Official Agreement A. Verbal · Clear, unprompted affirmative utterance including "yes", "okay", "alright" or equivalent unambiguous expression of consent.

B. Body Language of Agreement · Distinct downward nod of the head · Lowering of gaze in submission · Full bow

Silence is not construed as agreement.

In the event of refusal, the contract continues unchanged until session termination, and no penalty is imposed unless refusal itself is a component of the threatening mechanism.

Should the slave subsequently initiate agreement — that is, reverse its own refusal — the extension opportunity is no longer offered on equal terms. The Master may then impose heightened conditions, as the slave is now the petitioner, and the power dynamic has inverted.

Any such re-initiation by the slave is itself a violation — a breach of the fundamental rule that denies it the right to speak first. The Master may award punishment points accordingly, to be executed later in bulk.

If the slave accepts the new, stricter terms, the original procedure must still be followed: a fresh verbal "yes", or a fresh body signal, must be given. Only then is the deal sealed. No gap. No shortcut.

4.3.2 Form Execution To cement record and enforce finality: · The Master may personally complete the extension form, or · The slave is compelled to fill it under supervision

The latter is preferred — it forces the slave to write its own end. The emotion is not humiliation alone. It is the cold snap of reality: the signature proves the cage is self-built. No joy. No despair. Just irreversible fact.

4.3.3 Form Sealing Upon completion, the Master stamps or signs. The document is filed. Extension is sealed. The session continues — no pause, no celebration. In the event that the form is signed before any verbal or postural agreement, the extension is still valid and binding.

5. Accelerated Extensions Accelerated extensions are permitted at the Master's absolute discretion. There is no minimum interval. There is no maximum frequency. Extensions may be locked consecutively — even within minutes, even within the same hour — as long as the Master is mentally prepared to commit to the deepened duration. The progression table remains inviolate: extensions must follow sequence, regardless of velocity. The Master determines tempo. The Master determines depth. The Master determines how far he is willing to bind. The slave has no right to object. No right to slow. No right to question.

6. Extension Milestone Upon each extension, the Master may elect to activate one or more milestone upgrades. These upgrades are not automatically triggered the instant the extension is sealed. They are not mandatory on the dot. The Master has complete discretion to withhold, to delay, or to introduce them at any later moment that serves his purpose. Once a milestone is activated, it is permanent. There is no deactivation. There is no mercy phase.

6.1 Extension Milestone Table This table is not exhaustive. Additional milestones will be added as the project progresses.

Type of Extension

Final Duration

Milestone

First Extension

1 week

Second Extension

2 weeks

Third Extension

3 weeks

Fourth Extension

1 month

Teeth washing permitted

Fourth Extension

1 month

Panty washing allowed (as per hygiene protocol)

Fifth Extension

2 months

Normal food once every two weeks (slave is now longer term, the basic diet is insufficient to keep the slave usable for long term)

Fifth Extension

2 months

Multi vitamin pills once a day (slave is now longer term, the basic diet is insufficient to keep the slave usable for long term)

Sixth Extension

3 months

Washing Regime introduced (uniform washing allowed as per protocol)

Sixth Extension

3 months

Showering allowed (as per protocol)

Sixth Extension

3 months

Regular shaving routine introduced (as per protocol procedures)

Seventh Extension

4 months

Eighth Extension

6 months

Introduction of formal uniform and alternation

Eighth Extension

6 months

Off days introduced (twice a month, confined to chamber)

Eighth Extension

6 months

Introduction of permanent basic tampon - 12 hour per change cycle (reminder the slave that even the hole is controlled)

Ninth Extension

8 months

Tenth Extension

10 months

Eleventh Extension

1 year

Chest enlargement by usage of breast milking machine (long enough for effect, reversible)

Twelfth Extension

2 years

Collar with leash introduced (symbol of full ownership)

Thirteenth Extension

3 years

Fourteenth Extension

5 years

Fifteenth Extension

Lifetime

Full castration (only if at least 2 years service already)

Fifteenth Extension

Lifetime

Breast implant (reversible, only if at least 1 year service)

Fifteenth Extension

Lifetime

Welded-on permanent collar (only if at least 1 year service)

For hygiene related milestones: (Smell management prioritizes Master's nose over slave's well-being)

6.2 Acceleration and Milestone Realism Accelerated extensions allow the Master to compress the timeline of milestone activation. Although the table presents milestones in nominal order and at their earliest theoretical introduction point, the actual timing of activation is governed solely by the Master's discretion. The acceleration clause exists to ensure realism: milestones that appear "late" in the progression are not delayed by calendar rigidity, but may be introduced much earlier when the Master's mental preparedness and the slave's current state permit.

6.3 Separation of Milestone and Case-by-Case Measures Milestones are permanent, automatic changes to the baseline rules once activated. They are not discretionary after introduction and do not require ongoing Master approval. In contrast, certain measures (e.g., chore-specific accessory usage, temporary layering, or situational hygiene interventions) remain case-by-case decisions and are not milestones. These are activated only when the Master deems necessary and may be withdrawn at any time without affecting the permanent rule structure.

7. Types of Ownership Less than one month – Stint A short, exploratory phase for the Master. The slave was not even aware of, nor intended for, any arrangement extending beyond a maximum of 7 days. The slave retains an internal perception of temporary participation. The Master treats the arrangement as a trial with minimal investment in permanence.

One month to less than one year – Short-term owned slave At this duration, the arrangement is considered genuine ownership. The slave’s mindset begins to shift from viewing the dynamic as a temporary experiment to accepting it as an ongoing reality.

One year to three years – Termed ownership The ownership is time-bound and structured, similar to a foreign domestic worker serving a standard two-year employment contract in Singaporean households. The slave is treated as a contracted asset with defined duties and a foreseeable end date, yet the psychological conditioning continues to deepen.

More than three years – Long-term ownership The contract duration extends beyond the typical term. The slave’s sense of separate identity erodes further. The Master’s investment in control becomes more comprehensive and less contingent on a fixed expiry.

Lifetime – Permanent ownership – full-fledged slave Ownership is irrevocable and without end date. The slave is fully integrated as property with no conceptual escape. The dynamic is absolute; the slave exists solely for the Master’s purpose.

8. Criteria for Conditions & Milestones There are always two separate criteria that determine when (or after when) a new condition, milestone, change, or erosion can be introduced:

  1. Absolute service duration = the total real, continuous time the slave (Cassandra) has already actually served / been kept since the very first moment the initial contract started.
  2. Milestone upon agreement to a particular contract extension length = the total accumulated slavery time from day 1 that is being newly committed to / agreed upon when signing any extension contract.

Very important wording rule for the whole project: Whenever we say things like • "6 month extension" • "1 year extension" • "3 year contract" → it always means the new total absolute time from the very beginning (not just the additional period being added)

Key usage rules · A milestone / change / erosion can be introduced based on · criterion 1 alone, or · criterion 2 alone, or · both at the same time · Timing rule — very important: Reaching the time threshold does not mean the change/milestone must happen immediately. It only means the Master now has the option / justification to introduce it. → He can do it · the same day the threshold is reached, or · weeks later, or · months later → completely at his timing and discretion.

9. Leverage Strategy · High-debt / prolonged punishment = best carrot windows. · Slave agrees not because he wants the milestones, but because current hell is unbearable. · Carrots framed as relief from suffering — never as "improvement" or "pride."

· Refusal → carrot withdrawn + escalation → slave learns resistance prolongs trap. · Slave signs not from desire, but because current suffering is unbearable. · Slave agrees not because he wants the milestones, but because refusal means immediate escalation. · Refusal → carrot withdrawn + escalation → slave learns resistance prolongs trap.

10. Slave Mindset at Lifetime Offer (~1 Year+) · "There seems to be no other place out there that I have a purpose. Even if I got freed, I would not know what to manage." · Agreement is bleak, reluctant surrender to only remaining reality — not pride, not desire, not choice.

11. Trend of Slave Resistance It is highly likely that the slave will exhibit strong resistance against contract extension in the early days. As the final brainwashing and degrading of mindset sets in, this resistance gradually fades. The slave accepts not from want, but from a completely broken will. The Master makes significant effort to accelerate this process from the beginning so that he can use the slave to his advantage faster.

11.1 Detailed Progression of Mindset Erosion

Weeks 1–4 (Early Phase)

Resistance is at its peak. The slave still possesses a strong sense of separate identity and a clear boundary between "temporary play" and "permanent reality." Every extension proposal is met with visible hesitation, verbal pushback (if allowed), delayed compliance, or attempts to negotiate. The slave calculates risks, clings to hope of release, and experiences acute shame/guilt after each acceptance. The Master counters with frequent, layered pressure (punishment, denial, small carrots) to erode this boundary as quickly as possible. By the end of the first month, the effect is already taking hold: the slave's internal "no" becomes quieter, compliance becomes slightly faster, and the first cracks of conditioned helplessness appear.

Months 2–3 (Transition Phase)

Resistance weakens noticeably but is not yet gone. The slave begins to experience confusion between "wanting to resist" and "not knowing how to stop complying." Extension proposals are met with less verbal pushback; the slave may still freeze or tremble, but acceptance comes more readily. The Master intensifies degradation (uniform layering, extended chores, smell containment) to accelerate the breakdown of ego. By the end of month 3, the slave's mindset has shifted from active resistance to passive acceptance: refusal feels pointless, and the concept of "outside life" starts to feel distant and unreal.

Months 4–6 (Consolidation Phase)

Resistance is largely extinguished. The slave no longer fights extensions internally or externally. Proposals are met with immediate compliance (nod, kneel, quiet "yes") without visible struggle. The Master can now introduce longer jumps (months to years) with minimal friction. The slave's identity has been sufficiently degraded; "slave" is no longer a role but the default self. By the end of month 6, the process is effectively complete: the slave is broken to the point where lifetime feels like the only logical endpoint. Acceptance is no longer reluctant — it is automatic, empty, and total.

Months 7+ (Post-Breakdown Phase)

The slave is fully conditioned. Extension proposals are processed like any other command. There is no internal conflict. The slave does not "want" the extension, but the absence of any alternative reality makes refusal impossible. The Master no longer needs to accelerate — the slave is already owned completely.

Updates (All changes live here. Already merged in this version.) · 14/02/2026 – Version bump to v1 final: User edits integrated; form sealing updated; trend of slave resistance elaborated; no conflicts flagged. · 14/02/2026 – Added standardized tail end per Ground Rules v2.0 (Updates header, Conflicts template, empty Suggestions, Archived section).

Conflicts · Template: Old: … New: … Source: … Date: … Status: Pending (None present – all resolved or none identified.)

Suggestions (Empty.)

Archived from Previous Versions · Old drafts / early merges (pre-v1 final): Initial progression table without acceleration note; incomplete vector deployment details. · Archived for preservation only — current version supersedes.

 

No comments:

Post a Comment

Slave Life Storyline– The Makeover to be presentable for Guests

  Day 6, early evening (Right after earning  127,800 points!) A long pause fills the room. Master stands there, staring down at the mess I...